top of page
Tower assembly
Nova 40 with 20L Tank Assembly

Pump

Tank

Cover




Pipe

Bottom

Section
Crown


Netpot
connector


Screw
Add pump into Tank & Connect pipe with the help of connector to the pump

Tank
Pipe with
connector


Pump


Attacg pipe to pump

Add base to the Top cover Insert screws and nuts through holes

Section connected to bottom

Cover

Screwe nut

Attach Base to tank cover with help of 5 screws

Add top cover to the tank
_edited.png)
Previously
attached bottom and cover
_edited.png)
Tank with pump
_edited.png)
Add top cover to the tank

Add Sections one by one. Along with that, attach the central pipe with help of connector.







Pipe connector
Pipe
Section

_edited.png)
Add Sections one by one
Attach pipe with connector

Add Crown over the top section & Add all net pots

Crown

Netpots

.png)
Add crown
Assembly Video

bottom of page
_edited.jpg)

